Lean manufacturing case studies, with the numbers

Nine pieces of work, each with a measured result. Clients are anonymised at their request, so you will find sectors here and no names or logos. In every case the client's own people did the improving, with us alongside.

Quality cost and yield

  • High-end machinery manufacturer: warranty cost reduction

    Warranty costs had reached about €18m a year, and only 10–15% of field reports were complete enough to analyse. We mapped the warranty process across all sites, redesigned how failures are recorded, and trained around 400 field agents and 80 supervisors in structured problem solving.

    • 33% reduction in warranty costs over two years
    • Usable warranty reports up from 10–15% to about 90%
    • In a second project, dispatch of free-of-charge warranty parts fell from 32–40 days to 2–4 days in 80% of cases
  • Ceramic-copper board maker: yield and scrap

    Scrap, breakage and out-of-grade product were costing about €1m a year. We ran designed experiments on the bonding process with the site team and set up daily problem-solving routines across the plant.

    • Bonding yield up from 95.5% to the 97.5% target
    • Breakage down from 3.4% to 1.4%
    • Return on investment 3:1
  • Equipment manufacturer: making rework visible

    Rework in cable and generator assembly was never logged, so the site could not say what it was able to produce in a day. We mapped every production step, tackled the contamination sources, and introduced rework codes and a daily dashboard.

    • Rework brought under 10% of production time
    • Productivity saving of €100,000 a year
    • Rework measured and traceable for the first time

Inventory and supply chain

  • European automotive driveline manufacturer: raw materials inventory

    The business carried £116m of raw materials across 16 sites, with data spread over four ERP systems. We built a reliable baseline with every site and ran 256 reduction activities, including vendor-managed inventory and consignment stock.

    • £9.6m (8.2%) inventory reduction across 16 sites
    • Delivered against a stretch goal of £8.5m
    • Reusable standards for vendor-managed inventory and consignment stock
  • Global supply chain management: Plan for Every Part

    A “Plan for Every Part” framework, giving each part a defined supply and storage plan.

    • €0.5m saving
    • 30-day inventory reduction

Warehouse and distribution

  • Semiconductor equipment warehouse: goods-in and supply to production

    A new automated warehouse had opened without the inbound processes being redesigned to match. We redesigned the inbound flows, created a managed area for unidentified material, and brought first-in-first-out discipline to picking.

    • 75% cut in goods-in time, from 8 hours to under 2
    • 80% fewer expedited picks
    • On-time delivery to production up from 70% to 92%
  • Pharma distribution, eight sites: Lean pilot

    A corporate pilot set a picking target of 100 lines an hour, with sites starting between 65 and 90. We analysed each site, trained teams in Daily Kaizen in step with live improvements, and coached site managers throughout.

    • 100 lines an hour target hit across sites
    • 6.5 hours a day freed at one site
    • Site leaders left able to carry Lean forward on their own

Office and engineering processes

  • Till-system manufacturer: part-numbering overhaul

    The standard for creating part numbers had drifted, causing line stoppages and wrong parts. We mapped the process with the full cross-functional team, moved ownership to Engineering, and built a part-numbering playbook with them.

    • Part-numbering process cut from 31.5 to 5 days end to end
    • Hands-on processing time down 20%
    • Every part categorised in the new structure
  • Back-office Lean: debtor management and HR

    Seventeen staff each kept their own spreadsheet, and HR time standards could not be tracked. We mapped the processes with the teams, trained them in Daily Kaizen, and set up team boards.

    • 566 hours a year saved in debtor management
    • 17 spreadsheets replaced by one live master
    • Temporary contract renewals moved from email chains to a largely automated workflow